ANALISIS YURIDIS DAMPAK LINGKUNGAN PROYEK STRATEGIS NASIONAL PEMBANGUNAN TOL PADANG – PEKANBARU BERDASARKAN UNDANG – UNDANG NOMOR 32 TAHUN 2009 TENTANG PERLINDUNGAN DAN PENGELOLAAN LINGKUNGAN HIDUP

Authors

  • Muhammad Ronaldi Azizi Fakultas Hukum Universitas Bung Hatta
  • Sanidjar Pebrihariati.R Fakultas Hukum Universitas Bung Hatta
  • Sanidjar Pebrihariati.R Fakultas Hukum Universitas Bung Hatta

Keywords:

Impact, Environment, National Strategic Project

Abstract

In Indonesia, National Strategic Projects (PSN) such as toll road construction are an integral part of the government's plan to accelerate economic development and improve connectivity between regions. However, behind the expected economic benefits of large infrastructure projects such as toll roads, there are major challenges related to environmental impacts. Law No. 32/2009 on Environmental Protection and Management is the main legal foundation in Indonesia that regulates environmental protection and management. Problem formulation: 1) What are the legal consequences to the environment of the construction of the Padang-Pekanbaru toll road? 2) What are the environmental impacts that occur with the construction of the Padang-Pekanbaru toll road based on Law Number 32 of 2009 concerning Environmental Protection and Management? The research method used is normative legal research. The data source used is secondary data consisting of primary legal materials and secondary legal materials, then analyzed qualitatively. Research results: 1) Legal Consequences to the Environment, namely: a. Compliance with the Environmental Law. b. Obligation to carry out AMDAL. c. Regulation of protected and strategic areas in accordance with the environment. d. Obligation to comply and report on the environment. Obligation to comply and report on the environment. e. Transparency and accountability. 2) Environmental impacts that occur are: a. Air Quality Degradation. b. Soil and Biodiversity Damage. c. Socio-Economic Changes. d. The construction of toll roads along the length requires a very large area of land.

References

A. BUKU

Budiman, 2021. Pembangunan Kekuatan Minimum Komponen Utama Pertahanan Negara di Era New Normal. Publica Indonesia Utama.

Mayestati, 2022, Metode Penelitian Hukum, LPPM Universitas Bung Hatta, Padang.

B. Peraturan Perundang-Undangan

Undang-Undang Dasar Negara Republik Indonesia Tahun 1945. Undang-

Undang Nomor 38 Tahun 2004 tentang Jalan.

Undang-Undang Nomor 2 Tahun 2012 tentang Pengadaan Tanah Bagi Pembangunan Untuk Kepentingan Umum.

Undang-Undang Nomor 32 Tahun 2009 tentang Perlindungan danPengelolaan Lingkungan Hidup.

Peraturan Pemerintah Nomor 22 Tahun 2021 tentang Penyelenggaraan Perlindungan dan Pengelolaan Lingkungan Hidup.

C. Sumber Lain

Angela, (2022). Analisis Pelaksanaan Pengadaan Tanah di Atas Tanah Ulayat Masyarakat Hukum Adat dalam Rangka Proyek Strategi Nasional (PSN) Demi Kepentingan

Umum. Jurnal Hukum Lex Generalis, 3(3).

Astoni, 2022, Eksistensi Asas Pembangunan Berkelanjutan dalam hal 2 Pengakuan dan Penghormatan kepentingan Desapada Proyek Strategis Nasional, Jurnal Advokaturan Indonesia, 1(1).

Downloads

Published

2024-08-30