ANALISIS OVERALL EQUIPMENT EFFECTIVENESS (OEE) LINI PRODUKSI PABRIK PT LEMBAH KARET PADANG
Abstract
TPM is a continuous improvement process that is structured and oriented towards factory equipment. The application of TPM is measured by Overall Equipment Effectiveness to evaluate the effectiveness of the equipment. Preliminary research at PT Lembah Karet is seen as the low effectiveness of the use of machinery due to damage and high idle time and the total production is not fixed. The purpose of this study is to calculate the value of OEE on the production line that is problematic, find the cause of the low value of OEE and provide suggestions for improving the problem. Analysis of the causes of low performance that makes the low value of Overall Equipment Effectiveness is then analyzed by the fault tree analysis method. The results showed that the cause of the low performance value was due to the length of idle time caused by PLN disruption, empty raw materials, and orders that fluctuated each month. From the results of data processing, the average OEE value is 64.93%, this is below the world standard with a minimum of 85%. The low value of OEE in the PT Lembah rubber dry processing production line is due to the relatively low performance value.
Keywords: TPM, OEE, Fault Tree Analysis
References
Ahmad Muhsin. Analisis Performansi Departemen Machinning Menggunakan Metode Overall Equipment Effectiveness (OEE). Jurnal OPSI Vol. 9 No. 1 Juni 2016. ISSN 1693-2102
Aini Nur Mahdina dkk.2014.Peningkatan effectifitas lini produksi pada sistem produksi kontinyu dengan pendekatan total productive maintenance. Jurnal. Malang
Anwardi dan Yoga Pratama . Perbaikan effectifitas pekerja menggunakan overall labour effectiveness dan fault tree analysis Studi Kasus: PT. Riau Graindo Dumai. Jurnal Teknik IndustriVol, 4 No. 1, 2018.
Anwardi dkk.. Analisis overall equipment effectiveness (OEE) dalam meminimalisir six big losses pada mesin produksi di UD. Hidup Baru. Industrial Engineering Journal Vol.5 No.2 (2016) 52-57 ISSN 2302 934X
Betrianis dan Robby. 2004. Pengukuran nilai overall equipment effectiveness sebagai dasar usahan perbaikan proses manufaktur pada lini produksi. Jurnal Teknik Industri vol. 7 No. 2 Desember 2005: 91-100
Indra dan Handoyo. Analisa Kecacatan Kemasan Alcohol swabs dengan metode fault tree analysis. Jurnal. Jatim
Muhammad Khoirul Amin. 2016. Penerapan metode overall equipment effectiveness dalam meningkatkan efektifitas mesin pabrik susu. Jurnal Sketsa Bisnis Vol.3 No. 2 Desember 2016
Mukhril. 2014. Penerapan Pada Industri Total Productive Maintenance & Total Quality Management. Megakarya. Jakarta
Nasrullah dan Mauvina. 2017. Pengukuran Kinerja Produksi Hot Strip Mill dengan metode overall equipment effectiveness. Jurnal Teknoin vol 23 No. 2 juni 2017 : 153-160
Sariyusda dkk. 2016. Analisa efektifitas produksi pada unit urea 1 dengan menggunakan metode total productive maintenance di PT pupuk iskandar muda. Jurnal Polimesin (ISSN: 1693-5462), Volume 14, Nomor 1, Februari 2016
Suzuki, Tokutaro. 1994. TPM in Process Industries. Taylor & Francis Inc. Portland.
Wulandari, Trisya. 2011. Analisa Kegagalan Sistem Dengan Fault Tree. Skripsi. Depok.