“PERANCANGAN MEJA KERJA PADA STASIUN KERJA LABORATORIUM PABRIK KELAPA SAWIT PT. AMP PLANTATION”
Abstract
ABSTRACT
Palm oil mill PT AMP Plantation is one of the companies engaged in the
production of crude palm oil ( CPO ) , the raw material in this industry comes from the
company's own plantation and plantation society . Based on the research that has been
conducted on laboratory PT.AMP Plantation , working position for some work processes
are still wrong and needs to be repaired , is due to the design of the workplace and work
desk antoprometri and not in accordance with standard operating procedures ( SOP ) in
the working procedure . Workplace checks the CPO is working desk and desk checking
kuliatas CPO fiber separation and nut . This would greatly disrupt the productivity of the
operator is not comfortable in the work , even if the injury may mislead allowed to
continue for a long time . objectives of this study include the aim to design and repair
work table according workplace conditions based on human anthropometry . Instrument
data processing is done on the problems that occur when this is carried out anlisa GAP (
gap ) and the REBA method , to determine the results obtained have been optimized so
that all the goals set have been achieved as expected . The size of the initial work desk
with high work table 150 x 50 x 70 cm it is very disturbing in the checking process
because too low . After the design into a working table size164.14x76.32x85.75cm .
Keywords : Gap Analysis ( GAP ) , REBA , Human Anthropometric Data
Downloads
Published
2014-03-14
Issue
Section
Articles