STUDI KELAYAKAN PEMBANGUNAN GEDUNG PARKIR BERTINGKAT KOTA SUNGAI PENUH DITINJAU DARI ASPEK TEKNIS DAN FINANSIAL
Abstrak
The city of Sungaipenuh is the second largest city in Jambi Province, Indonesia. The city wasformed based on the Law of the Republic of Indonesia Number 25 Year 2008 which is an expansion
of Kerinci Regency and its ratification is done by the Minister of Home Affairs on October 8, 2009.
Sungaipenuh City has a total area of 39,150 ha. In the area of Sungai Penuh City there are various
traffic problems which one of them is parking problem, where the capacity of existing parking space
can not meet, so it takes an area to accommodate vehicle for parking. The author is interested in
researching to find the solution of the problem, in this study will be investigated the problem solving
is one of them by planning the construction of multi-storey parking building in Sungai Penuh City.
To build a parking lot, it is necessary to do research. This study aims to determine the financial
feasibility of the parking building plan development. The method used in this research is NPV, BCR,
IRR and Payback Period Method. The result of this research is expected to overcome parking
problem in Sungai Penuh City, and can give an idea of investment in the construction of multi-storey
parking building in Sungai Penuh City, and hopefully in the construction of this parking building
will not cause new problem.
Keyword :Finansial Analysis, Parking Building, Sungai Penuh City
##submission.downloads##
Diterbitkan
2019-05-22
Terbitan
Bagian
Artikel