PERFORMANCE ANALYSIS OF HEAVY EQUIPMENT OPERASIOANAL FROM NS 53A TO NS 45A REHABILITATION AND DEVELOPMENT PROJECTS IN IRRIGATION BATANG ANAI IN THE DISTRICT PADANG PARIAMAN WEST SUMATERA
Abstract
Irrigation Rehabilitation and Development Project Batang Anai is a large-scale project that uses a lot of heavy equipment to assist the completion of work in particular on the pile and excavation work, it is necessary to plan for the implementation of the method, especially on the type of job, sfesifikasi or type of equipment used to be assigned the performance heavy equipment and produce good quality work according to planned. pile volume 57 157,33 and 491.40 excavation volume, used heavy equipment 1 unit Kobelco Excavator - 6, Bucket Cap 0.9, 1 unit Komatsu PC 200-7 Excavator Bucket Cap 1.83 , 2 Units Komatsu Bulldozer Blade capacity D68Ess 1.3 , 2 Unit 512D Vibro Roller Sakai compaction width ( from 2 to 0.2 ) M, 8 Units Dump Truck Dump Truck Mitsubishi Colt 125ps Dieselhd Cap 8.75 . Based on the analysis results obtained brand Kobelco Excavator 1 unit and 1 unit of Komatsu Excavator productivity gained 189.49 / hour, 309 -hour long work hours and equipment rental costs Rp.195 560 000,- 2 units of brand Caterpillar bulldozer gained 44.88 / hour productivity, long working hours and 642 hours of equipment rental costs Rp . 365 460 000,- , 2 units vibro sakai roller brand gained 66.67 / hour productivity, long working hours and 447 hours of equipment rental costs Rp.131 700 000,- 8 units of dump trucks brands mitsubishi colt dies productivity gained 24.86 / hour, 642-hour long work hours and equipment rental costs Rp.984 300 000,-, overall equipment rental fee of Rp.1.67702 billion, Old completion of the implementation work effectively acquired 642 hours or 81 days of work effectively. .Keywords : Productivity, Time, Rent, Fees
References
A. Referensi Dari buku
Bangun, Ateta, 2009, diktat kuliah pengembangan tanah mekanik ( PTM) & alat berat , depertemen teknik sipil fakultas teknik universitas sumatera utara, medan
Iskandar Tiong, Ratna Ayu Lila, dan Ardiansyah Widha, 2010, Analisa Kinerja Operasional Penggunaan Alat Berat, Jurnal Sondir Teknik Sipil Ftsp Institut Teknologi Nasional, Malang
Rasyid, Muhammad Rusli, 2008, Analisa Produktivitas Alat-Alat BeratProyek,Tugas Akhir Jurusan Teknik Sipil Fakultas Teknik Sipil Dan Perencanaan Universitas Islam Indonesia, Yogyakarta.
Rohcmanhadi, 1982, Alat Berat Dan Penggunaannya, Depertemen Pekerjaan Umum, Jakarta.
Rostiyanty, Susi Fatena 2002,” Alat Berat Untuk Proyek Kontruksi, Rineka Cipta, Jakarta.
Yost, Yutiar, 2006, Pemindahan Tanah Mekanis ( Ptm) Dan Alat Berat, Buku 1, Pengenalan Alat Berat,
Universitas Bung Hatta Padang, Padang.
B. Referensi Dari Internet
http://eprints.undip.ac.id/33842/5/1639_chapter_II.pdf
http://teknisiberat.blogspot.com/2011/11/menghitung-kapasitas-produksi-sebuah.html