PERENCANAAN SISTEM KELISTRIKAN DAN SUMBER TENAGA LISTRIK (Aplikasi Kawasan Stadium Utama Sumatera Barat)
Abstract
The main stadium area of West Sumatera is located in the Lubuk Alung sub-district, Padang Pariaman district, covering an area of approximately 38 hectares. The main stadium area of West Sumatera consists of 6 building units, namely (GOR 1 building, GOR 2 building, GOR 3 building, main stadium building, athletic tribune building, and aquatic building). The total power is 2,602,363 Watts with TDL PT. PLN (Persero) 2,770 kVA voltage 20 kV. From the three locations for the placement of the substation, the cost of distribution cable channels is obtained, namely the middle East Rp 50,934,394,900 the North center Rp 12,993,577,300 and the central South Rp 13,725,059,660. Placement of a more efficient power source is the North central from the area, there is a difference of approximately IDR 37,209,335,240. Keywords: Electricity System, Losses, Voltage Drop, Electrical System CostDownloads
Published
2022-02-10
How to Cite
Yani Ridal, & Hajrul Muarif. (2022). PERENCANAAN SISTEM KELISTRIKAN DAN SUMBER TENAGA LISTRIK (Aplikasi Kawasan Stadium Utama Sumatera Barat). Jurnal Teknik Industri Universitas Bung Hatta, 8(1), 62-71. Retrieved from https://ejurnal.bunghatta.ac.id/index.php/JTI-UBH/article/view/20031
Issue
Section
Articles